Home to Global Legal Information For Legal Professionals Home
Bare Acts
Rules and Regulations
Draft Agreement
Agreements & Contracts
Cyber Laws in IT & ITES

With the phenomenal and enormous growth of Internet specialized branch of Law called Cyber Law.

Immigration & Emmigration

When a person enters a new country for the purpose of establishing permanent residence and ultimately gaining citizenship , it is called

Immigration.But the residence of immigrants is subject to the conditions set by the Immigration Law.


Power requirements for Long Term Loan

The followings should be furnished in the form regarding power in respect to a long term loan:-

Sources of power and supply voltage taken from Electricity Board

own generation

stand by arrangements

Maximum demand

Connected load

Peak hour requirements

Energy consumption per year

Power tariff

Cost of power per annum at maximum capacity utilization (give calculations);

Enclosures:

  1. Copy of letter of sanction of power
  2. Copy of agreement with Electricity Board
  3. Copy of electrical lay out of the plant.
Water and other utilities such as fuel, steam and compressed air

Indicate the requirements and suitability of water

ii) Describe water treatment arrangements proposed

iii) Capacities of tanks, reservoirs

iv) Sources of supply of water arrangement proposed and water charges payable

b) i) Requirements of steam

ii) Capacity of the boiler

iii) Arrangements proposed for steam

c) i) Requirements of compressed air

ii) Arrangements proposed for compressed air

d) i) Requirement of fuel

ii) Arrangements proposed for supply

Transport arrangements proposed for carrying raw Materials and finished goods;

Furnish full details of the volume of atmospheric, soil and water pollution likely to be created by the project and the measures proposed for control of pollution. Indicate whether necessary permission for the disposal of effluent has been obtained from the concerned authorities; if so, a copy of the certificate should be furnished.

Details of the arrangement made for quality control. If ISI specifications are followed, No. of ISI standards and the particulars thereof should be provided. Particulars of R & D activity proposed.

Schedule of implementation

Describe how the design of engineering, erection, Installation and commissioning of the project will be carried out. Also indicate the progress made so far in the implementation of the project and furnish the schedule of implementation as follows:

Commencement Completion

i) Acquisition of land

ii) Development of land

iii) Civil works factory building machinery foundation auxiliary building

Administrative building

Miscellaneous building

iv) Plant and machinery

Imported - Placement of order

Delivery at site

Indigenous - Placement of order

Delivery at site

v) Arrangements for power

vi) Arrangements for water

vii) Erection of equipment

viii) Commissioning Commencement Completion

ix) Initial Procurement of raw material & chemicals

x) Training of personnel

xi) Trail runs

xii) Commercial production

Other projects of the concern

Give details of any other new/expansion projects which are under implementation or which the promoters propose to implement giving the estimated cost, means of financing and the present status.